| Imtiaz Yayasan Terengganu secondary school complex, Kampung Tok Muchong (design and build) In progress | Marang, Terengganu | State Secretary of Terengganu | Design and build contractor | Building | 99,998,888 | 2023–2027 |
| Drainage improvement works, 50 MWac Sepang solar farm In progress | Sepang, Selangor | TNB Sepang Solar Sdn. Bhd. | Main contractor | Drainage & water | 4,703,000 | 2025–2026 |
| Upgrade of the Perbadanan Kemajuan Cameron Highlands office, Cameron Fair | Tanah Rata, Pahang | Perbadanan Kemajuan Cameron Highlands | Main contractor | Building | 2,516,628 | 2025 |
| Interior fit-out, Volvo Selekt showroom, Mutiara Damansara (design and build) | Petaling Jaya, Selangor | Ingress Swede Automobile Sdn. Bhd. | Design and build contractor | Building | 597,700 | 2022 |
| MBKT administrative complex, Southern Breakwater: interior works, internal and external signage, and landscaping (design and build) | Kuala Terengganu | JKR Terengganu | Nominated subcontractor | Building | 22,000,000 | 2016–2022 |
| Ecological drainage, Kwasa Damansara township, work packages WPC1B and WPC1C | Sungai Buloh, Selangor | TSR Bina Sdn. Bhd. | Subcontractor | Drainage & water | 1,240,040 | 2016–2019 |
| Ecological and bioretention drainage, Kwasa Damansara township, work package WPC1A | Sungai Buloh, Selangor | WCT Construction Sdn. Bhd. | Subcontractor | Drainage & water | 4,100,000 | 2016–2017 |
| MBKT administrative complex: brickwork, door frames, lintels and plastering, including a variation order of RM1,215,465.99 | Kuala Terengganu | Excel Engineering & Construction Sdn. Bhd. | Subcontractor | Building | 3,573,275 | 2015–2020 |
| MBKT administrative complex: formwork and podium block | Kuala Terengganu | Excel Engineering & Construction Sdn. Bhd. | Subcontractor | Building | 562,066 | 2015–2018 |
| Design, supply, installation, testing and commissioning of pipework, fittings, valves, pumps and flow meters for a tank farm, Tok Bali Supply Base | Pasir Puteh, Kelantan | Astral Far East Sdn. Bhd. | Subcontractor | Oil & gas / industrial | 3,412,800 | 2015 |
| MRT Sungai Buloh–Kajang Line, package MSPR6: multistorey car park, external works and associated works, Taman Bukit Mewah station | Klang Valley | Suhati Sdn. Bhd. | Subcontractor | Infrastructure | 5,000,000 | 2014–2018 |
| Single-storey banquet hall and two-storey office, Seksyen 14 | Bandar Baru Bangi, Selangor | Bulatan Mekar Sdn. Bhd. | Main contractor | Building | 5,986,656 | 2014–2019 |
| BMW showroom and service centre | Puchong, Selangor | Ingress Auto Sdn. Bhd. | Main contractor | Building | 3,330,914 | 2013 |
| Rural water supply reticulation programme 2012/2013, Zone 1B | Negeri Sembilan | Ministry of Rural and Regional Development | Main contractor | Drainage & water | 3,242,543 | 2012–2013 |
| BPS showroom and service workshop (design and build) | Sungai Penchala, Kuala Lumpur | Ingress Auto Sdn. Bhd. | Main contractor | Building | 2,600,000 | 2012 |
| Repair, renovation and upgrade of Istana Badariah, including a supplementary contract | Kuala Terengganu | JKR Terengganu | Main contractor | Building | 14,700,000 | 2011–2012 |
| Landslip repair on the PROSDET rural access road, Kampung Pantos | Ulu Jelai, Lipis, Pahang | Ministry of Rural and Regional Development | Main contractor | Slope & geotechnical | 995,888 | 2011 |
| Polo field upgrade, Terengganu State Equestrian Sports and Recreation Centre (design and build) | Kuala Ibai, Kuala Terengganu | JKR Terengganu | Main contractor | Building | 9,880,000 | 2009–2010 |
| Coastal protection, Pantai Batu Buruk, phase 2 (design and build) | Kuala Terengganu | Excel Engineering & Construction Sdn. Bhd. | Subcontractor | Coastal | 4,790,528 | 2009–2010 |
| Conversion of Asrama Anas into an academic block, Universiti Darul Iman Malaysia (now UniSZA) | Gong Badak, Kuala Terengganu | Universiti Darul Iman Malaysia | Main contractor | Building | 2,893,756 | 2009–2010 |
| Renovation of the former reception building for the Sembunyi Spa, Pulau Duyung | Kuala Terengganu | Terengganu State Treasury | Main contractor | Building | 848,600 | 2009 |
| Landslip repair at Tanjung Metong, Tasik Kenyir | Hulu Terengganu | Excel Engineering & Construction Sdn. Bhd. | Subcontractor | Slope & geotechnical | 1,235,000 | 2009 |
| JKR guest house, Lot 176 Batu Buruk, phase 2 | Kuala Terengganu | YTR Resources Sdn. Bhd. | Subcontractor | Building | 1,940,000 | 2009 |
| Slope rehabilitation, drainage and related works, Kolej Matrikulasi Perak | Gopeng, Perak | YTR Resources Sdn. Bhd. | Subcontractor | Slope & geotechnical | 1,726,610 | 2008–2009 |
| Slope repair and reconstruction, Sessions and Magistrates' Court, Raub | Raub, Pahang | Excel Engineering & Construction Sdn. Bhd. | Subcontractor | Slope & geotechnical | 761,549 | 2008 |
| Development works, Pulau Besar | Merang, Setiu, Terengganu | Excel Engineering & Construction Sdn. Bhd. | Subcontractor | Infrastructure | 2,619,000 | 2008–2009 |
| Coastal protection, Pantai Batu Buruk, phase 1 (design and build) | Kuala Terengganu | Excel Engineering & Construction Sdn. Bhd. | Subcontractor | Coastal | 14,015,000 | 2008–2009 |
| Renovation of the Yang Dipertua Muda wing, audience hall, offices and surau, Istana Terengganu, phase 2 | Jalan Kia Peng, Kuala Lumpur | Excel Engineering & Construction and Bukit Jerneh Quarry joint venture | Subcontractor, interior works | Building | 5,000,000 | 2008–2009 |
| JKR guest house, Lot 176 Batu Buruk, phase 1 | Kuala Terengganu | YTR Resources Sdn. Bhd. | Subcontractor | Building | 2,910,000 | 2007–2008 |
| Slope stability and building integrity works for a hotel development, Pulau Banding | Gerik, Perak | Excel Engineering & Construction Sdn. Bhd. | Subcontractor | Slope & geotechnical | 448,629 | 2007 |
| Shoreline erosion protection with geotubes at the river diversion | Kemaman, Terengganu | Excel Engineering & Construction Sdn. Bhd. | Subcontractor | Coastal | 380,000 | 2007 |
| Design and repair of a water tank slope, Bukit Perah | Dungun, Terengganu | Excel Engineering & Construction Sdn. Bhd. | Subcontractor | Slope & geotechnical | 1,061,320 | 2007–2008 |
| Shoreline erosion protection and beach enhancement with geotubes, Telok Kalong | Kemaman, Terengganu | Excel Engineering & Construction Sdn. Bhd. | Subcontractor | Coastal | 550,000 | 2007 |